Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, histonroad |
Date time: | 2.15pm, Wednesday 1st December, 2021 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
The painted edge to the new cycle lane on Histon Road turns into a kerb past these businesses.
Comments reflect the views of the original submitter only.