Donate using PayPal

All photos in & around Derby

Showing items 101 to 200 from total of 374 locations. Ordered by photo number.

Photo # Photo Caption Categorisation
129252

Introduce one way system loop around bottom half of uttoxeter new road and great northern road to allow for wider cycle lane up uttoxeter new road, very dangerous for cyclist with numerous junctions

Cycleway:
Problem
129238

Many big pot holes that need filling in bus/cycle lane heading towards Derby City Centre

Cycleway:
Problem
129099

Very poor road surface, in need of urgent attention

Cycleway:
Problem
129081

The road here is three lanes wide with a large central reservation, there is enogh room to put in dedicated onstreet cycle lanes. You could also take out some of the turns into Westfield and make cars turn around at the roundabout making traffic flow better. The road crossings should also cross both carriageways at teh same time as this just slows people down. Leicster is doing this more and more and its really good.

Cycleway:
Problem
129070

Road surface needs sorting.

Track:
Problem
129028

A clearer cycle/walking section for the path. Increased lighting and trimming of trees to increase safety when using the path in the evenings. This is my fastest path home from work at the RDH however in winter I take a longer route down Uttoxeter Road and up Ashbourne Road as do not feel safe using this path once it is dark. Improving this path would encourage more people to walk to Kingsway from the local area, reducing traffic at the island and into Kingsway.

Track:
Problem
128941

Need cycle paths throughout derby so no need to use roads

Track:
Problem
128725

The whole of Uttoxeter Road is very very narrow for the amount of traffic that needs to use it. Join this with a horrendous road surface and delivery vans frequently parked over cycle lanes and, even with the majority of drivers being considerate, it feels like a death trap for cyclists.

Cycleway:
Problem
128676

20mph and restrict parking near primary school

Temporary closure:
Problem
128675

Main south direction for cyclists. Needs proper cycle lane

Cycleway:
Problem
128671

Dual purpose path i.e. walking/cycling from Heatherton to Littleover avoiding pastures hill. Increasing traffic. Path needs widening to accommodate both cyclists and pedestrians

Cycleway:
Problem
128643

This is a very busy road so either a cycle lane on the road or footpath would be good. This is used by school children as well as people commuting on their bikes

Cycleway:
Problem
128624

Cycle path along the A52 from Highfield Lane and Meadow Lane becomes overgrown and is so bumpy bits on my bike fall off, needs smoothing out and making wider.

Track:
Problem
128620

Road surface is very poor on the left hand idea, forcing cyclists to move to the centre of the road

Cycleway:
Problem
128599

Needs continuation of cycle path. Also cycle path too narrow

Cycleway:
Problem
128581

Busy road, 40mph limit, impatient drivers and close passing common

Cycleway:
Problem
128579

Very poor road surface here

Cycleway:
Problem
128576

40 mph traffic regularly exceeding speed limit and vehicles overtaking cyclists do not leave room making cycling both frightening and dangerous

Cycleway:
Problem
128573

Cycle path needed on this road, improvements to road surface and reduction to 30mph of the whole road past Hackwood with the new house

Cycleway:
Problem
128572

Road surface is in poor condition. Not safe to cycle near curbside out of the way of fast moving buses, taxis etc.

Cycleway:
Problem
128571

There is no cycle path on the road after the bridge up to Tesco in Mickleover. Also, the road has a few pot holes.

Cycleway:
Problem
128569

Build cycle lanes on major roads around hospital especially high speed roads like Manor road.

Cycleway:
Problem
128568

This is a narrow fast road, with frequent 'Rat runs', buses, lorries and taxis squeezing past

Cycleway:
Problem
128566

Whole road is not suitable for cycling with traffic - road needs improvement

Cycleway:
Problem
127461

Cycle way into Derby. This road is very busy for cyclists

Cycleway:
Problem
127456

Cycle path or lane for cyclists. The road here is very busy and uneven. A cycleway would make it safer for cyclists

Cycleway:
Problem
127454

Cycle path extended so it is all the way along Wilmore Road. Could the pavement be widened and designated a cycle path.

Cycleway:
Problem
126855

An entrance to the new shared cycle / pedestrian path. Cyclists have to stop and lift their bikes up a large kerb at present, so tend to ignore it and continue cycling on the road.

Cycleway:
Problem
126850

Gaps in speed humps to allow cycles to navigate them comfortably. Existing humps with kerb stones embedded are harsh on a bike.

Cycleway:
Problem
126849

As dual carriageway reduces to single lane, cyclists at risk from cars cutting in or dangerously overtaking. Physical separation needed from traffic lights (Sinfin Lane) to Village Street junction.

Cycleway:
Problem
126837

Cyclists turning right from Uttoxeter Rd to Western Rd have to cross a lane of fast moving traffic to get into the right turn lane. Then getting onto the cycle cut-through opposite the pelican crossing is awkward. New physical infrastructure is needed to make this safer (eg an exit for cycles on left to allow them to safely cross all traffic lanes using a shared pedestrian / cycle crossing).

Cycleway:
Problem
126407

Change footway to cycleway to give access to Morrisons from Little Eaton/Breadsall/top end Chester Green (in theory you'd be expected to ride down the A61!)

Cycleway:
Problem
126363

Dangerous crossing between two good bits of cycleway. Need to provide a light controlled crossing.

Cycleway:
Problem
126361

Dangerous crossing between two good bits of cycleway. Need to provide a light controlled crossing.

Cycleway:
Problem
126236

Make Abbey Street access only so that it becomes a safe route for cycling and walking

Temporary closure:
Problem
126228

Add a cycle lane between Harrington Street, Baseball Drive and Colombo Street

Cycleway:
Problem
126225

Add a contraflow cycle lane to provide a cycle connection between Wilfred Street and Cambridge Street.

Cycleway:
Problem
126221

Add a cycle lane to provide cycle access to The Arboretum

Cycleway:
Problem
126206

Extend the on-pavement cycle lane and add a drop curb before the point where the road narrows over the railway bridge, rather than afterwards.

Cycleway:
Problem
126169

On Burton Road between the traffic lights at Abbey Street and the start of the Bus Lane just after Gerard Street cycle have to cycle in the middle of the road to avoid parked car doors and all the potholes in the centre of the traffic lane.. A dedicated cycleway is required.

Cycleway:
Problem
124980

Develop one way system in this area for vehicle traffic, blocking some access with filtered permeability.

Temporary closure:
Problem
124964

All streets bounded within Kedleston Road, Broadway and the A6 should have speed limit reduced to 20 mph.

Cycleway:
Problem
124957

All the streets bounded within the A6 and the river to have reduced speed limit to 20 mph, compatible with vulnerable road users.

Cycleway:
Problem
124954

Macklin Street and adjoining streets reduce the speed limit to 20 mph, compatible with cycling.

Cycleway:
Problem
124953

Green lane and adjoining streets reduce speed limit to 20 mph, compatible with cycling.

Cycleway:
Problem
124952

Gower Street reduce speed limit to 20 mph, compatible for cycling.

Cycleway:
Problem
124951

Reduce speed limit on Babbington Lane to 20 mph, compatible for vehicles and cycles.

Cycleway:
Problem
124950

All streets in this area should have maximum speed limits of 20 mph. Within the boundary of Traffic street, Siddals road, Railway Terrace, Midland Road and London Road.

Cycleway:
Problem
124947

Reduce speed limit to 20 mph

Cycleway:
Problem
124923

Reduce speed limit to 20 mph compatible with combining vehicles with cycles.

Cycleway:
Problem
124922

Reduce speed limit to 20 mph.

Cycleway:
Problem
124913

Add cycle lanes along Jury Street in both directions, reduce speed limit to 20 mph compatible with combining vehicle and cycle traffic.

Cycleway:
Problem
124910

Create cycle lanes along Bold Lane in both directions and reduce speed limit to 20 mph, compatible with combining vehicles and cycles.

Cycleway:
Problem
124900

The speed limit on Full street should be 20 mph to be compatible with bi-direction cycle lanes

Cycleway:
Problem
124556

Few near misses here.

Cycleway:
Problem
124498

Close this to cars.

Temporary closure:
Problem
124495

You could fit in a pop up cycle lane here

Cycleway:
Problem
124125

Make the pavement cycle / pedestrian compatible along the whole length of Broadway

Track:
Problem
124118

Access from Bridge Street to Mill Street. Install a bike friendly central refuge and pedestrian / cycle use of pavement.

Cycleway:
Problem
124105

Visibility from path to road and no signage to continue journey.
Improve junction with stop signs on path and more singage.

Cycleway:
Problem
124000

A separate cycleway along the route of the surfaced footpath from Woodlands Lane at the top of Allestree Park to Cornhill

Cycleway:
Problem
123946

Repair and tarmac shared use path from Raynesway Bridge to the B5010. In the short term just repair the flood damaged sections.

Cycleway:
Problem
123666

Make the junction between Allestree Lane ,Blenheim Drive and Oakover Drive a 4 way stop. This would slow traffic down on Allestree Lane and make this dangerous junction safer for cyclists and pedestrians, particularly young people going to Woodlands school.

Cycleway:
Problem
123558

To stop rat running in Ford Lane estate a road closure should be added to stop access from Ford Lane to A38. This is best done on Derbyshire land but could be done on Derby land at junction of Lambourne Drive and Ford lane with access onwards just to reach premises

Temporary closure:
Problem
123314

Convert current footpath alongside the A52 a multi use path so that riders can safely cycle up to Radbourne Lane and beyond

Cycleway:
Problem
123041

Simple solution to problem of rat runs and driving the wrong way on a one way is to close it full stop and make it only walking and cycling.

Temporary closure:
Problem
123037

Stop rat running

Temporary closure:
Problem
123035

Add in provision for cyclist to cross over the dual carriageway providing a direct safe link between st Albans Rd and Constable lane.

Temporary closure:
Problem
123030

Improve outbound cycle lane to 1.5m segregated not the current 50cm cycle lane we have that puts cyclists in the gutter.

Cycleway:
Problem
123027

Retain the on road cycle bus and taxi provision by The Greyhound Pub, reduce the number of outbound car lanes and add in a outbound on road 1.5m segregated path.

Cycleway:
Problem
123022

Close this to cars and the bottom end of Babbington lane. create more space for pedestrians and cyclists.

Temporary closure:
Problem
123020

Close the bridge to cars

Temporary closure:
Problem
123018

Close this road to cars as was originally intended when Connecting Derby was first put forward. Closing this road to cars will stop a rat run across the city centre and make the roads much safer for walkers and cyclists.

Temporary closure:
Problem
123017

No need for a through road here.

Temporary closure:
Problem
123015

This road goes between two parks on either side of the road. The road is a rat run between two major arterial routes. There is a major dual carriageway about 400m away. Easy to use.

Temporary closure:
Problem
122963

Currently uneven graveled bike lane that isn't safe to ride on and can damage bikes. Path is please

Track:
Problem
122863

Put a cycle way in alongside the A38 to connect up to Mackworth, Kingsway and the hospital

Cycleway:
Problem
122727

Make the whole of Church Lane/ Mileash Lane 1-way, northbound only.

Temporary closure:
Problem
122719

Close the road off from here to stop through traffic using it as a shortcut to manor road.

Temporary closure:
Problem
122716

Widen the footpath and add greenery similar to Crich avenue, footpath is too narrow especially when trying to socially distance, people have to go on to the road and the traffic can be busy at times.

Track:
Problem
122558

Pavement not wide enough for cyclists and pedestrians. Westbound: Cycle lane ends abruptly close to bend obscuring view of oncoming traffic. Cyclists have to cross road and rejoin carriageway with limited visibility when heading NW. improve surface and accessibility of pathway behind hedge for cyclists/pedestrians heading in opposite directions.

Cycleway:
Problem
122309

Cars are using Lawn Heads Avenue as a short cut cutting across to get to manor road, in the process they are speeding down and are sometime travelling double the 20mph speed limit. By closing the Avenue off it will make it safer for residents also cyclist and walkers that use this route. There have been too many near misses and this will also help reduce pollution levels around the area reducing unwanted traffic.

Temporary closure:
Problem
122227

Normanton Rd is a vibrant commercail street, but narrow pavements, busy traffic and car parking make social distancing impossible with customers queuing outside shops. Close Normanton Road to all traffic except cycles, buses and delivery vehicles and make a 20mph speed limit.

Temporary closure:
Problem
122154

Separate lanes for cyclists and pedestrians near the primary school, it can be dangerous at school time.

Cycleway:
Problem
122149

Crossing lghts to cross are very slow to change for pedestrians and cyclists, change lights give priority to these users at the lights.

Cycleway:
Problem
122145

This is right next a school and cycleway, pedestrians and cyclists should have priority crossing not cars.

Cycleway:
Problem
121866

Lawn Heads Avenue is being used as a rat run ideally if closed off from Burton Road this will be ideal there are a lot of children living on the avenue and motorist are not adhering to the 20mph limit. Would also make an ideal walking and cycling route

Temporary closure:
Problem
121800

There needs to be a wheel channel alongside the steps here, and a track put in place alongside Mansfield Road to link to Chester Green. The path from Pektron to this point needs clearing and widening. A link to The Great Northern Greenway and the Racecourse Cycletrack is also needed by installing a cycle/pedestrian crossing at Bristol Street roundabout.

Track:
Problem
121780

London Road leads directly to the NHS sites off Oxford Street and a connection is required to enable NHS staff to cycle from the cycle paths on the inner ring road to the NHS sites - London Road Community Hospital. Pop-up cycle lane all the way along London Road from Bradshaw Way to Batemen Street/Osborne St.

Cycleway:
Problem
121777

The shared path from London Road onto Bradsahw Way is so narrow only one person acan WALK through there at a time. The left lane on London Road needs to be coned off, and the cones extended round the corner onto Bradshaw Way to allow cyclists and pedestrians to navigate through this bottle neck. The left lane on Bradshaw Way. Access back onto the wider shared path is needed once onto Bradshaw Way.

Cycleway:
Problem
121774

Very narrow pavement on corner of Osmaston Road and Lara Croft Way. Left lane to be coned off on Osmastion Road from where one lane widens to two lanes; coned ff area to extend round the corner onto Lara Croft Way as far as the sccess point back onto the cycle path. This space can be used by pedestrians and cyclists.

Track:
Problem
121561

Create new off road cycle path all the way from Friar Gate Bridge south west, through Friar Gate goods yard, around back of new school, parallel to Slack lane and then onto Royal Derby Hospital

Cycleway:
Problem
121560

Create new off road cycle path all the way from Friar Gate Bridge south west, through Friar Gate goods yard, parallel to Slack lane and then onto Royal Derby Hospital

Cycleway:
Problem
121559

Clear wasteland strip on Highfields Road to create off road link to Duffield Road allowing residents to move about in clean air space

Cycleway:
Problem
121557

Pedestrianise The Strand, adding RFID rising bollards for business access (ideally EV delivery vehicles only) - also allows local restaurants to create big outside dining spaces with social distancing

Temporary closure:
Problem
121555

Link riverside path to new canal path via aqueduct as plans of Derby & Sandiacre Canal Trust www.derbycanal.org.uk/ this would then complete missing link cycle way from Derby to Spondon, Borrowash, Nottingham etc

Cycleway:
Problem
121553

Add another (attractive) pedestrian and cycle bridge across the river to reduce the bottlenecks of river crossings.

Cycleway:
Problem
121551

Albert st should be closed to all motorised vehicles and become cycle and pedestrian only. The river running underneath the street should be uncovered to create a beautiful waterside multi-user path.

Temporary closure:
Problem
121550

Victoria Street should be closed to all motorised vehicles and become cycle and pedestrian only. The river running under Victoria street should be uncovered to create a beautiful waterside multi-user path.

Temporary closure:
Problem
121549

Pedestrianise St Mary's Gate, adding RFID rising bollards for business access (ideally EV delivery vehicles only)

Temporary closure:
Problem

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://derby.cyclestreets.net/photos/all/page2.html
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.